The Engineering Department does not have the resources to carry out
some types of work. For instance, there will always be the need for
major structural upgrades. In these instances, it is necessary to use
the equipment and labour force of outside contractors.
When an outside contractor is used, there must be a central point of
co-ordination to draught the plans for the desired restructuring or
building, and to ensure that the work being carried is exactly to plan.
The Sixties Wing
High on top of the Sixties Wing sits Robin Ward, which has just undergone
a much needed facelift internally together with outside repairs and
redecoration including re-roofing. Below are Le Quesne Ward, the Critical
Care Unit (CCU) and the main Operating Theatres. Out of view is Accident
and Emergency and the Theatre Sterilising Supplies Unit (TSSU).